Reactive production
“Every day starts with a fire.”
Before
Breakdowns were reported over the phone and forgotten by the next shift.
After
Every problem has a named owner and a response deadline, and it is flagged the minute that deadline passes.
Operational stability for CNC job shops
We stabilise CNC job shops: workflow discipline, built into a system your team actually uses, and coached on your floor until it holds.
Needs immediate attention
Sample shopSound familiar?
Tap the ones that sound like your shop.
If three or more of these sound like your shop, the problem usually isn't your people or your machines. It's the way work flows between them.
Why shops stay unstable
A machine stops, the plan changes, and each change pushes the next. Without a fixed way to absorb them, small disruptions add up to late deliveries.
What changes on your floor
The change happens in how work moves through your shop. The system we build around it is how it stays that way. Here is what that looks like day to day.
Reactive production
Before
Breakdowns were reported over the phone and forgotten by the next shift.
After
Every problem has a named owner and a response deadline, and it is flagged the minute that deadline passes.
Pressure-driven decisions
Before
Every job was “urgent”, and priorities changed with every phone call.
After
Rush jobs are approved on purpose, against a promised date, and flagged the moment they go off track.
Workflow discipline
Before
“Where is my job?” meant a walk to the machine and three phone calls.
After
Every job’s stage, good pieces and risk are visible in one row.
Execution clarity
Before
Shift handover was a two-minute chat at the gate.
After
Each job carries a written status, an expected finish and the next step.
Operational fragility
Before
Nobody could say what happened, who acted or how long it took.
After
Every step (reported, owned, fixed, closed) is on record with a name and a time. This one went from reported to closed in 54 minutes.
Operational stability
Before
The same breakdowns came back every month.
After
Patterns are reviewed with numbers: what recurs, what is overdue, how fast fixes happen.
Examples built for a sample shop, with demo names and data. Every system is designed around the shop it is built for.
How we work
Free 90-minute walk, then 2–3 days on site
We start with a walk on your floor and name 3 places where work is losing stability. In the review we follow real jobs, find where they wait and why, and record your starting numbers: late jobs, open problems, response times.
You get: a map of how work really flows, and what your system must do. See a sample review report →
Timeline fixed in writing before we start
We design the rules first (who owns a problem, how fast they must respond, how priorities change), then build them into a simple system your team uses on the floor, on a phone or a PC.
You get: a system built around your shop, not a package your shop must adapt to.
On your floor, month by month
We work with your supervisors and operators until the new way is a habit, and we adjust the system as your shop changes. Progress is measured with the same numbers we recorded at the start.
You get: a team that runs the system without anyone chasing it.
Specialization
Manage complex setups, tool changes, machine capacity, and multi-shift production without losing control of workflow.
Maintain quality, documentation, and production coordination across complex, tolerance-critical workflows.
Manage frequent changeovers, variable routing, and unpredictable order flow without allowing workflow instability to spread.
Based in Delhi NCR, working with CNC job shops across India and abroad. Outside Delhi NCR? Message us and we'll plan together how we can best support your shop.
Why not just buy software?
Why work with a new firm
We won't show you client logos we don't have. Instead, you see our thinking on your own floor before you pay anything, and the risk of the first step is ours.
Open to the first 3 shops
Free 90-minute floor walk. At the end you get 3 places where your workflow is losing stability.
A fixed quote for the review, based on your shop's size and days on site, agreed in writing before we start. Founding shops pay a reduced fee that roughly covers our time on your floor.
In return, we record your starting numbers and, with your permission, share the results as our first case study.
Promise 1
If the review doesn't find at least 3 problems costing you time, money or deliveries, you don't pay for it.
Promise 2
If you go ahead with the build, the full review fee is adjusted against it.
Our team brings more than 13 years of building workflow systems that help owners run the business and keep daily work on track. The same team comes to your floor, runs the review, builds your system and coaches your people until it holds.
“Companies that run on systems grow. Shops that run on phone calls and memory lose the owner's day to firefighting, whatever their size. KeshRaghTech exists to give every shop that stability, built around how its own floor works.”
Heena, Founder About us →
Practical, shop-floor thinking on scheduling, WIP, and production flow.
A customer asks where their order is, and the answer means a phone call to the supervisor or a walk around the floor. The problem isn't missing software. A job spends most of its time waiting between machines, and nobody records the waiting. Here's how to know where every job is.
Read Insight arrow_forwardYou plan on Monday. By Wednesday the OEM has changed quantities, pulled in one part and pushed out another. You can't stop the changes, but you can control how they enter your shop. Here's how suppliers keep the floor stable when the customer schedule isn't.
Read Insight arrow_forwardIn a CNC job shop the bottleneck is rarely the machine everyone points at. It moves with the job mix, and it's often not a machine at all. Here are five checks to find the real one, a worked example, and what to do once you've found it.
Read Insight arrow_forwardQuestions owners ask
We don't sell a software package. We study how your shop runs, design the workflow it needs, and build that workflow into a system your team uses on a phone or a PC. It can run on a shared, economical setup or as your own separate setup; we suggest which suits you after the review.
The floor walk is free. After it, you get a fixed quote for the review based on your shop's size and the days we need on site, agreed in writing before we start. If the review doesn't find at least 3 problems costing you time, money or deliveries, there is no fee, and if you go ahead with the build, the full review fee is credited to it.
The walk takes 90 minutes with you on the floor. The review is 2-3 days on site, mostly watching real jobs and talking to the people who run them, so production keeps running. The build timeline is fixed in writing before we start.
Any size. What matters is not the number of machines but how the shop runs: if work moves by phone calls, memory and chasing, there is stability to gain.
No. The workflow system covers what happens on the floor: jobs, priorities, problems, handovers and response times. Your accounting and billing stay where they are.
Each screen is built for the person who uses it, with only what they need, and it works on a phone. We coach on the floor until using it is routine, not a one-time training.
We are based in Delhi NCR and work with CNC job shops across India and abroad. If your shop is outside Delhi NCR, message us on WhatsApp and we'll plan together how the visit and support can work for your shop.
Book a 90-minute walk on your floor. At the end you get 3 places where your workflow is losing stability, whether or not you work with us.
Book a free floor walkOr ask us a question first